Wednesday, May 17, 2006

Crosswinds Pond Progression



Lots of progress since the 4/30 post. These photos were taken at 2 p.m. today. The streambed digging was Thursday (finishing in the rain) and Saturday. Last night Nelson and I detailed the pond and, then, today Brent, the pond expert, came in to help the crew fine tune and line the pond with landscape fabric, underlayment, liner and rocks.

The black box (a filter) at the top of the photo is the top of the first waterfalls which will snake toward the left and then to the right, drop down another foot into the stream bed and finally into the actual pond, which is about 11x15.

More later -- but now it's time for class

0 Comments:

Post a Comment

<< Home